Jlg 4017 Platform Operator Manual Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Section 3 - Operation
3-1
31200029
SECTION 3 - OPERATION
3.1 WARM-UP AND OPERATIONAL CHECKS
This section outlines the checks to be performed at the beginning of each work shift
or at each change of operator.
Warm-up and operational checks of the telehandler are to be completed before
entering the platform. Refer to the Operator & Safety Manual supplied with
telehandler.
After start-up from platform and engine warms, check:
1. Horn must be audible with engine running.
2. All boom and platform functions - operate smoothly and correctly.
3. Perform any additional checks described in Section 7.
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 63 64

Comentarios a estos manuales

Sin comentarios